Firehall Capital Campaign
We are proud to be a volunteer fire department,
but we cannot do this alone.



These drawings are for illustrative purposes only. The final design is subject to change.
Campaign Progress
" Your contribution — no matter the size — will help ensure the safety and protection of everyone who lives, works, or visits McKenzie Clearwater."
SHANNON JOHNSON, MCFD Fundraising Co-ordinator

Dear Community Member,
For more than 30 years, the volunteers of the McKenzie-Clearwater Firehall have proudly served our community — responding day and night to protect our families, homes, and businesses.
As our community grows, so do the demands on our fire department.
Emergency call volumes and equipment needs have increased so that our current facility can no longer keep pace. Space limitations impact training, response readiness, firefighter health and the safe storage of lifesaving gear.
To ensure we are ready for today's needs and tomorrow's, we have launched a $3 million Capital Campaign to build a new firehall that will:
- improve emergency response capacity
- provide safe and modern space for equipment and training
- support our growing team of volunteer firefighters
- ensure long-term safety for our entire community
We are proud to be a volunteer-driven department, but we cannot do this alone.
Your contribution — no matter the size — will help ensure the safety and protection of everyone who lives, works, or visits McKenzie Clearwater.
Together, we can build a firehall that reflects the strength and resilience of our community.
With gratitude,
Rick Suche
McKenzie Clearwater Volunteer Firehall
Shannon Johnson
Firehall Fundraising Co-ordinator
Special Note on Firehall Funding
Funding for the Firehall Development Project will be provided entirely through donations and grants.
Fees received from the Keeman Local Services Board cover a significant portion, but not all, of the McKenzie-Clearwater Fire Department’s day-to-day operating costs and are insufficient to fund capital projects. These projects include the purchase of rescue vehicles, replacement of boat motors and firefighting hoses, and the construction of a new firehall.
Support
your
Firehall
Development
today
Contact Shannon Johnson at fundraising@mckenzieclearwaterfire.ca
or
use our contact form
Project Budget
Since the Firehall Capital Campaign was launched in 2025, the budget for the project has moved from $2MM to $3MM.
Why the increase?
-
In 2025, the need for an expanded fire hall had been identified and the board initiated preliminary discussion around a 4500 SF expansion of the existing building.
-
Concept high level drawings of the expansion were generated.
-
A preliminary cost for the expansion was estimated at $2,000,000 based on very general industry norms at the time.
-
Subsequent development work and research led to the conclusion that expanding the existing building was not advisable for several reasons:
-
Code compliance of the existing building and required fire separations from the new addition
-
Disruption to ongoing fire department operations
-
Combustible construction of the existing building
-
Deteriorated condition of the existing building
-

Proposed site plan - new and existing firehalls.
-
As a result of this conclusion, work began on developing requirements and a budget for a new 6000 SF steel building on the west side of the existing firehall.
-
This decision alleviated all the concerns around the previous plan and allowed for reuse of the existing building for storage and community space.
-
A more thorough budget was assembled for the new building concept including 3rd party estimates from local design builders. It is NOT based on firm bids.
-
The current budget for the new 6000 SF steel building is $3,000,000 including contingencies and taxes.
Proposed Firehall Design



PROPOSED MAIN FLOOR LAYOUT

PROPOSED SECOND FLOOR LAYOUT